June 10th, 2022
With the exterior completed, the dumpster and equipment gone, and the mud dried up, it's time for the final grade. This felt like a bigger deal than it was; it took the yard from construction site status to yard status.
Due to all the mud we dealt with early on, the entire courtyard was graveled right up to the fronts of both buildings. When I talked with the excavator's young employee, I asked him to give us a little more green space, which meant digging out gravel and replacing it with real dirt. He seemed a bit dismayed by this request, but did it willingly.
Sid's shop: This was the largest area that was dug out. Now, 3 years later, I'm really glad we did it. It's the biggest green space.
The west end of the house. This is where the most hill had to be removed to fit the house in, resulting in a rather large slope. The worker was going to just smooth the hill all the way to the house, but I had him scoop out an area of relatively flat lawn. It's all graded to allow the water to flow away from the house, and currently needs a bit of attention to correct the settling along the wall. It left us with a fairly steep bank which has been a bear to get grass to grow on, and to mow.
The side yard- this is the area between the buildings. Photos taken from the little extra window that ended up at the attic landing.
June 14th, 2022
LAST load of gravel delivered to finish things off.
Finished driveway!
Sprinklers and hoses in use, attempting to start a lawn. This has been a long process! Three years in and I'm still starting seed in various places.